PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Setting the rebar mats at Elev. 1,2,3 2nd Floor Facing South (800x600).jpg Setting the rebar mats at Elev. 1,2,3 2nd Floor Facing South -2 (800x600).jpg Set Rebar along the footings at Elev. 7-Stair -4,5 Facing South (800x600).jpg Tying up the rebar mats at Elev. 1,2,3 2nd Floor Facing South-East (800x600).jpg Waterproofing along foundation walls at C-C.7 Facing South-East(800x600).jpg Waterproofing foundation walls at Elev. 1,2,3 Facing South-East (800x600).jpg Water Penetration Test at 10 lb.-sq. ft. Left Side (Middle Section) (800x600).jpg Rebars at footing layout at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg
Previous pageNext page Tying up the rebar mats at Elev. 1,2,3 2nd Floor Facing South-East (800x600)
Tying up the rebar mats at Elev. 1,2,3 2nd Floor Facing South-East (800x600)